Aug 18, 2026
Savannah Accounts for 3 of 4 US Ships Awaiting Berth, West and Gulf Coasts Clear
All three major complexes remain at Flowing. The US ships-awaiting-berth count is 4, with Savannah holding 3 of those vessels. LA/Long Beach and the West Coast report zero ships awaiting berth.
Numbers as of Aug 18, 2026 pull
Cite
Get the weekly port brief
Get The Dwell in your inbox every Tuesday. No spam, we won't ever share your email, and you can always unsubscribe.
The US ships-awaiting-berth count stands at 4 ships this week per MARAD and the Marine Exchange, with Savannah accounting for 3 of those 4 vessels awaiting berth, near its trailing-12-month normal of 2 ships. LA/Long Beach reports 0 ships awaiting berth, below its trailing-12-month normal of 1 ship. West Coast and Gulf Coast anchor counts are both at zero, and all three major complexes hold a Flowing import-friction read.
- LA/Long Beach ships awaiting berth: 0, down 100% from the five-year median (MARAD/Marine Exchange). The truck planning-time index (BTS) sits at 4.07, at its trailing-12-month normal of 4.07. Import-friction read: Flowing.
- Savannah ships awaiting berth: 3, down 66.7% from the five-year median (MARAD/Marine Exchange), near the complex's trailing-12-month normal of 2 ships. Import-friction read: Flowing.
- East Coast ships at anchor: 4, down 73.3% from the five-year median (MARAD/Marine Exchange), consistent with Savannah carrying the bulk of the US queue.
- West Coast and Gulf Coast ships at anchor: 0 each, both down 100% from their five-year medians (MARAD/Marine Exchange).
- NY/NJ import-friction read: Flowing. Truck planning-time index (BTS) at 3.82, near its trailing-12-month normal of 3.97.
Latest available monthly loaded imports (port authority data): LA/Long Beach 917,583 TEU, near its trailing-12-month normal of 831,412 TEU. NY/NJ 388,842 TEU, near its trailing-12-month normal of 372,973 TEU. Savannah 240,445 TEU, near its trailing-12-month normal of 231,586 TEU.
Monthly TEU figures are the latest available from each port authority and lag several weeks behind the current date.